Language
Cart

gang-way-page

Tower Type Gangway with Jib Crane

tower type gangway with jib crane58212942013

The CCLPEC CL4 tower-type gangway produced by our company is mainly composed of bulwark ladder (composed of main ladder, front ladder: foldable ladder or telescopic ladder, triangular ladder), rotary platform, lifting and slewing mechanism, tower, hydraulic system and electrical control system. The tower gangway is suitable for large ships greater than 50,000 DWT. The gangway is installed at the front of the wharf and uses 380V 50Hz three-phase five-wire power supply, which can meet the safety and requirements of various operations.

 

Product Details

 

Technical Features

20200818170814ada3b73c84eb489ea8dc2e1573d40917
  • -Scope of Supply Included but not limited to:

    Main body of Gangway, wireless remote control equipment, ground operation control equipment, electrical control system, hydraulic system, lighting system, piping and wiring, foundation embedded parts, supporting tools and spare parts.

  • -Advantages of CL4 Tower Gangway:

  • -The tower-type gangway serves large vessels and ensures stability of operation.

  • -The tower-type gangway is equipped with a jib crane to complete lifting of oil transfer hose. This product is an important equipment on wharf, of which the safety, reliability, flexibility, etc, must be fully considered, so it should be manufactured and installed with higher standard.

  • -The sub-vendors of CCLPEC gangways are strictly selected, the electrical instruments and hydraulic equipment are selected from world-class brands, and QAQC control procedures are strictly implemented.

  • -In order to better prevent the corrosion of marine condition, the tower and steel structure are welded with seamless square steel pipes. The surface treatment and anti-corrosion will also fully consider corrosive environment, and the painting process will be submitted to the customer for approval.

  • -Due to the use of counterweights, the weight of the lifting platform and gangway is balanced, which can reduce power of motor and reducer.

  • -The stair in the tower is designed at an angle suitable for the operator to get up and down easily and comfortably.

  • -The front ladder step adopts four-link structure. The four-link structure allows all steps to be balance at different pitch angles of ladder. Step adopts non-slip design, which improves safety factor.

  • -The main steel structure and auxiliary structure of the gangway are made of ordinary carbon steel profiles with strong weldability.

  • -The low-alloy steel Q345B is used for the stress frame of the ladder, and the step is made of aluminum alloy pattern plate and steel frame riveted.

  • -The hydraulic pipeline is made of 304 stainless steel, and all the pins are made of 40Cr with a lubrication groove.

 

The main technical parameters

Material of bulwark ladder

LF5 Aluminum Alloy / Q345B Steel

Width of bulwark ladder:

700 mm

Movement type of bulwark ladder:

folding / telescopic

The main parameters of the pitching mechanism:

Working level: M4

Pitch speed: 36~72 deg/min

Main parameters of the slewing mechanism:

Working level: M4

Slewing speed: 0.17 r/min

Slewing angle: ±90°

Lifting speed:

4.5 m/min

Main parameters of hydraulic system:

Working level: M4

Working pressure: 16 MPa

Main parameters of electrical system:

Motor protection rating: IP55

Instrument protection level: IP65

Explosion-proof grade: ExdIICT4

 

Introduction of Jib Crane

  • -The jib crane is a lifting device used to lift the hoses to connect vessel tankers, which can meets the hose lifting operation requirements at any height no matter it is for full loaded large tanker or unloaded small tanker. It can be placed on the dock or on the top of the gangway for saving space. The jib crane includes base foundation, rotary column, suspension arm, load hook, operating platform and an electro-hydraulic control system, etc. The jib crane can achieve the movements of platform rotation, hook lifting, and suspension arm pitching.

Technical Features of JIB Crane

  • -It is hydraulic drive, resulting in flexible and stable operation, and easy to maintain;

  • -When lifting within design weight range of crane, the strength, rigidity and stability of the suspension arm can meet the requirements;

  • -Multiple safety devices are installed according to related standards and meet the requirements of the crane safety regulations;

  • -The hydraulic power unit is separated from the rotary column which can avoid leakage;

  • -The crane can be operated by manual or wireless remote-control.

Technical parameters

Drive mode

Manual, Hydraulic

Safe working load (SWL)

0.5T~2.0T

Maximum working radius

20m

Lifting speed

0~15m/min

Upward angle

0~75°

Slewing angle

0~360°

Explosion-proof grade

Exd II BT4

Protection level

IP55, IP65

Motor power:

7.5 ~ 15KW

Precautions before operation

a. Make sure the wind speed is less than 25m / s.

b. Do not operate on thunderstorm days.

c. The platform can only be raised and lowered when no one is on bulwark ladder or its work area.

d. During the upward and downward movements of platform, make sure that the limit switches on each floor are closed.

e. During the entire operation process, if an emergency situation happens (such as topping, injury, interference, etc.), press the emergency stop button (on the platform button box, on the main control cabinet) or turn off the main power.

f. Overloading is strictly prohibited! It is strictly forbidden to carry more than 5 people on bulwark ladder at the same time